Does Colorado require FGI plan review? For many regulated healthcare facilities, the answer is yes. However, the FGI review is only one part of the approval process. A project may also require review by the Colorado Department of Public Health and Environment, or CDPHE, a local authority having jurisdiction, and the applicable fire and life safety authority.

The exact path depends on the facility type, licensing status, location, and scope of work. Colorado’s regulated-facility index shows that the 2018 FGI Guidelines apply to several categories, including hospitals, community clinics, hospices, and other licensed healthcare settings.

Vertix Builders helps healthcare owners identify these requirements during preconstruction. Early review-path planning allows permitting, phasing, budgeting, and occupied-facility operations to be coordinated before construction begins.

Who Reviews Healthcare Plans for FGI Compliance in Colorado?

Colorado healthcare projects may involve several reviewers. These reviews may overlap, but they address different regulatory responsibilities.

CDPHE Reviews Applicable Healthcare Facility Projects

CDPHE’s Health Facilities and Emergency Medical Services Division oversees a wide range of regulated providers, including hospitals, clinics, ambulatory surgical facilities, dialysis centers, and long-term care facilities.

For facilities subject to state design review, CDPHE evaluates the project against applicable licensing regulations and FGI requirements. Its dedicated FGI resources describe the Guidelines as minimum standards for the planning, design, and construction of healthcare facilities.

CDPHE also publishes the status of active, backlogged, and completed facility design-review projects. This confirms that design review is a formal process that should be incorporated into the project schedule rather than treated as a final permitting step.

Vertix Builders’ guide to Colorado healthcare regulations explains why regulatory coordination should begin before permit drawings are complete.

Local AHJs Still Control Local Permits

CDPHE review does not replace local building permits. Local AHJs may review the project under adopted building, accessibility, mechanical, plumbing, electrical, and energy codes.

FGI also states that the AHJ is ultimately responsible for determining how FGI requirements apply within its jurisdiction. This makes early communication important when state licensing rules and locally adopted codes address the same rooms or building systems.

A healthcare constructability review can identify conflicts between regulatory requirements, clinical workflow, existing conditions, and construction sequencing before they become field changes.

Fire and Life Safety Review May Follow a Separate Path

Fire and life safety review may be handled by a local fire department, a state authority, or a combination of reviewers. Responsibility varies by project location and facility type.

The team should confirm who will review:

  • Means of egress
  • Fire-rated assemblies
  • Fire alarm and sprinkler systems
  • Smoke compartments
  • Temporary exits
  • Interim life safety measures

These requirements are especially important during phased renovations because construction barriers and temporary routes can affect how patients, staff, and emergency responders move through the facility.

When Does Colorado Require FGI Plan Review?

FGI applicability is generally tied to the facility’s regulatory category and the type of work being completed. It should not be determined by square footage alone.

Start With the Facility Type

Hospitals, ambulatory surgical facilities, licensed clinics, behavioral health facilities, and unlicensed medical offices do not necessarily follow the same process. Before design begins, the team should determine how the facility is licensed and which regulations apply.

A conventional medical office renovation may primarily require local permitting. Work inside a licensed hospital department or regulated outpatient facility may also require CDPHE coordination and FGI review.

Evaluate What the Project Changes

New construction, additions, changes of use, and renovations affecting licensed patient care functions are more likely to require state review than cosmetic improvements.

Potential review triggers include changes to:

  • Patient treatment or procedure rooms
  • Licensed beds or clinical services
  • Department functions and patient flow
  • Ventilation and pressure relationships
  • Handwashing and support spaces
  • Life safety systems
  • Infection prevention measures
  • Accessibility and egress

FGI requirements address minimum program, space, infection prevention, architectural, surface, and building-system conditions. Even a limited remodel can therefore create broader compliance questions when it affects a regulated clinical area.

The Vertix Builders FGI compliance checklist outlines practical considerations for translating these requirements into design and field planning.

Confirm Requirements Before Design Is Finalized

Late confirmation can result in revised layouts, additional support rooms, mechanical redesign, or permit resubmittals. These changes are more disruptive once equipment has been ordered or phased work has begun.

Early coordination should confirm:

  • The applicable FGI edition
  • Required CDPHE documents
  • Local permit packages
  • Fire and life safety reviewers
  • Submission and inspection milestones
  • Conditions for occupancy or turnover

Vertix Builders’ article on healthcare code compliance explains how early planning helps teams coordinate code requirements with schedule, procurement, and active operations.

Colorado FGI Plan Review Requirements: Frequently Asked Questions (FAQs)

The following questions can help healthcare owners plan their approval and construction strategy before drawings are locked.

Does every Colorado medical office require FGI plan review?

No. The review path depends on how the facility is classified, whether it is licensed, and what the project changes. An unlicensed medical office may follow local permitting requirements, while work in a regulated clinical facility may require CDPHE and FGI review.

Does CDPHE approval replace a local building permit?

No. CDPHE and local AHJs have different responsibilities. A project may need both state healthcare facility review and permits from the local building department.

When should the contractor become involved?

The contractor should become involved during early design or preconstruction. Early involvement allows the team to evaluate phasing, existing conditions, long-lead systems, temporary controls, and inspection requirements before they affect the schedule.

What happens when the scope changes after approval?

A material scope change may require revised drawings or additional review, particularly when it affects licensed services, patient care functions, ventilation, or life safety systems. The change should be evaluated with the design team and applicable AHJs before work proceeds.

Plan the Review Path Before Construction Begins

So, does Colorado require FGI plan review? Many regulated healthcare projects do, but the correct answer depends on the facility and scope. CDPHE review, local permits, and fire and life safety approvals may all apply, and approval from one authority does not automatically satisfy another.

Vertix Builders brings healthcare construction experience into the process early, coordinating regulatory milestones, constructability, phasing, and occupied-facility requirements. Contact Vertix Builders to discuss the review path and construction plan for your Colorado healthcare project.