Swedish Medical Center
Englewood, CO
HealthOne Swedish Medical Center is one of the premier hospitals in the Metro Denver area. As a facility that operates 24 hours a day, public safety, especially working around doctors and patients, is the number one priority. Vertix Builders brings a highly trained staff working through infection control, creative separation, and phased construction to allow construction projects to move ahead efficiently life saving operations of the hospital.
Specs
-
USP 800 Pharmacy Upgrade:$1M
-
Physicians Lounge:$360k
-
Gamma Knife Upgrade:$150k
-
Cath Lab:$350k
-
CT Replacement:$300k
-
MRI Replacement:$120k
-
Robotics OR:$3.4M
-
Vacuum Pump Upgrade:900k
-
Southwest ER Remodel:$800k
-
Cardiovascular OR:$2.6M
-
Modular Cath Lab:$230k
-
RF Room Remodel:$250k
-
COVID-19 Isolation Rooms:~
-
Cath Lab Upgrade:$800k
-
MRI Replacement:~
-
Electrical Gear Screen Walls:$400k
-
IR2:$1.2M
-
Domestic Hot Water Upgrade:$200k
-
SROR:$200k
-
Tower Painting:$400k
-
601 MRI:$100k
-
Admin Suite:$1.6M
-
Cath Lab #1 Remodel:$600k
-
Entry Garden:$1.6M
-
Gamma Source Rep:$100k
-
OR 4&6 Integration:$700k
-
ADL Kitchen:$50k
-
Breast Pump:$25k
-
IR4 Renovation:$175k
-
Lab Equip Upgrade:$500k
-
Ortho Gym:$100k
-
Wellness Center:$100k
-
3T MRI:$900k
-
Aesthetics:$800k
-
AHU-22-HX Replacement:$3.7M
-
Linac Replacement:$700k
-
OR 8:$400k
-
OR 8 & 11 Boom Replacer:$75k
-
PET CT:$1M
-
RAD Room 7:$100k
-
AHU 20:$2.5M
-
Birth Place Refresh:$300k
-
CT Relocation:$900k
-
ED Case Reno:$300k
-
Loading and 499 Dr:$100k
-
Pre-Admit Remodel:$600k
-
Rehab Nurse Station:$100k
-
Robotics or Remodel:$3.4M
-
SW ER Upgrades:$1M