How to Choose a Healthcare Construction Company: A Step-by-Step Guide for Facility Leaders
- Ted Laszlo
- 52
- 7 Sep 2026
Key Takeaways:
- Focus on builders with recent, relevant healthcare work—not just general commercial experience.
- Use a structured scorecard to compare safety, planning, infection control, and cost clarity.
- Always check references.
- Choose a partner who can show healthcare-specific processes, transparency, and real project results.
Ground-Up Medical Office Design Considerations: Balancing Safety and Continuity
- Ted Laszlo
- 118
- 21 Aug 2026
Key Takeaways:
- Design must protect a safe work zone and predictable access for people and services while phasing construction near active patient-care areas.
- Prefabrication and durable finishes speed up construction, but the real goal is reliable, controlled delivery rather than raw speed.
- Good design optimizes patient flow, staff efficiency, and early equipment planning so the building functions well from day one.
CT Scanner Construction Requirements for Ground-Up Healthcare Builds
- Ted Laszlo
- 174
- 19 Aug 2026
Key Takeaways:
- Bring the full team in early (medical physicist, structural, MEP, IT, infection prevention) to avoid redesigns and inspection delays.
- Use a pre-install checklist (power, cooling, shielding, data, rigging) to keep delivery and install on track.
- On ground-up imaging builds, early logistics planning and clear permit/inspection sequencing matter as much as walls and MEP.
MRI Construction Requirements Checklist: What Every Facility Director Needs to Know
- Ted Laszlo
- 173
- 14 Aug 2026
Key Takeaways:
- MRI build-outs demand early coordination of MR safety zoning, RF shielding, quench venting, and MEP systems.
- Most “surprise” delays come from missed details: uncontrolled access, sloppy penetrations, fringe-field conflicts, or late changes inside the RF envelope.
- A healthcare-experienced contractor helps convert OEM requirements into a buildable plan that stays aligned to OEM criteria, code, and schedule.
Surgery Center Design Guidelines for New Facilities
- Ryan Bonner
- 121
- 12 Aug 2026
Key Takeaways:
- Early integration of clinical workflows, regulatory requirements, and construction planning is essential to avoid costly delays and ensure a successful, on-time surgery center opening.
- Strategic layout design, right-sizing spaces based on real case volume, and proactive coordination with equipment vendors are critical for operational efficiency and future scalability.
- Proactive compliance management, including early code alignment and detailed permit documentation, streamlines approvals and protects your project's timeline and budget.
Top Hospital Upgrade Design Considerations for Modern Healthcare Facilities
- Ted Laszlo
- 191
- 31 Jul 2026
Key Takeaways:
- Put infection control and life safety first so the project is inspection-ready from day one through turnover.
- Design around real workflows: consistent layouts, clear sightlines, and right-sized support spaces reduce friction for staff.
- Plan utilities and future flexibility early so the building can scale with service lines, tech, and patient volume.
Construction Phase Insights: Setting Up a Clean, Commissioned Healthcare Facility
- Ted Laszlo
- 143
- 24 Jul 2026
Key Takeaways:
-
Ground-up healthcare projects are most successful when you plan for start-up and commissioning from day one, not just the last few weeks.
-
Clean construction practices, protected systems, and disciplined moisture management create a stable environment for reliable equipment start-up and building performance.
-
Early commissioning, clear sequences of operation, and coordinated training help you open on schedule and reduce post-occupancy issues.
10 Essential Emergency Room Renovation Guidelines for Healthcare Facility Leaders
- Brady McQuinn
- 460
- 18 May 2026
Key takeaways:
-
Phased construction planning, rigorous infection control protocols, and daily coordination with clinical teams are essential to safely renovate emergency rooms without disrupting patient care.
-
Real-time monitoring of noise, vibration, and air quality, along with clear communication and documentation, ensures compliance and protects both patients and sensitive medical equipment during renovations.
-
Partnering with experienced healthcare construction teams enables facility leaders to navigate complex regulatory, safety, and operational challenges unique to occupied medical environments.
How Core and Shell Construction Supports Flexible Medical Office Design
- Ryan Bonner
- 660
- 27 Apr 2026
Key takeaways:
- Smart MEP capacity, structural grids, and circulation planning let medical buildings adapt to diverse tenant needs.
- Plumbing-ready slabs, adequate floor heights, and accessible service zones reduce renovation costs and speed up move-ins.
- Early attention to compliance and infrastructure sizing protects investment and enables seamless tenant improvements.